Tuesday, 22 March 2011
Cladding under way
Getting bolted down
Joining the old-fashioned way
Topping out!
Family lend a hand
Wednesday, 16 March 2011
Oak Carport
Start of Oak Frame assembly
Front fence finished
Drive base installed
Friday, 25 February 2011
Garage slab- fence posts
Enjoying a rest- Valentine's day
Fencing posts
up to the knees in ......
Tuesday, 8 February 2011
Work Started on Garden
Tree roots ground out
Getting ready for garage slab
Garden cleared and footing for fence posts installed
Wednesday, 12 January 2011
Doors Hung & Wardobes installed
Doors fit the openings- after a little modification!
Now they only require stops/architraves/handles/locks/staining
Ever seen beams growing out of a wardobe before?
Wednesday, 22 December 2010
Carpets & plumbing upstairs
our first hand basin
en-suite is fitted out
master bedroom carpet
landing all striped out.
Monday, 20 December 2010
Christmas has arrrived
Banbury Cross
Banbury Centre
House-complete with fairy lights
Ready for Carpets?
Staircase-ready for staining
Master bed- ready for carpet- and doors
Wow! we have a floor- having removed all the junk
Olwen- putting her best foot forward
Sunday, 12 December 2010
Attic and Staircase
Attic is boarded out(ready for storage)
with help from my little boy
banister rails and spindles installed
all we require now is carpet
Tuesday, 7 December 2010
Staircase Started
Landing banisters going in
Oak Newel post Fixed in position
Bathroom- with Dado rail and bath panel
Bathroom tiling finished- awaiting hand basin
Sunday, 21 November 2010
En-suite tiling
LEDs light up the bedroom
En-suite tiling complete(plus inbuilt cupboards)
next will be cleaning and grouting
and installing the basins.
Saturday, 20 November 2010
Bathroom / Ensuite/ Lounge
Gas/Coal Stove installed in Lounge
Lounge tiles
Bathroom floor tiles and WC installed
Wet room floor with drain
En-suite underfloor heating
Saturday, 9 October 2010
Fitting Kitchen is an exhausting experience
kitchen taking shape
some of the paint went on the walls!
Mr. I'm down right knackered!
Thursday, 30 September 2010
Kichen starts to be fitted out
removing the excess grout
Breakfast bar in place
Cabinet carcasses in place